Physical Address

304 North Cardinal St.
Dorchester Center, MA 02124

Boeing warns hundreds of working paths with NASA moon rocket in Limbo


Boeing is a concern that the Potential Layrof Space Launch System (SLS) team can be at risk after the mass cost and schedule of NASA missile. Both Trump.

The company is waiting for about 400 positions until April 2025. “We are working with our customers and look for employees in our company to re-use our employees on our employees within our employees.”

The 5.75-Million-Pound SLS Rocket, Powered by A Boeing-Built Core Stage, is Essential to Nasa’s Artemis Moon Program. SLS started on November 16, 2022 For the mission of Artemis 1, send an Orion spacecraft to a voice around the month and the rear. The missile, in April 2026, Artemis 2, Artemis, AMOLO, Artemis 3 in Oron, AMOLO, Artemis 3, a while ago in 2027 opening the first group.

NASA’s mass moon rocket, but turned into a budget nightmare. NASA’s Office General Total (OIG) From February 2022, he conducted a verification in April 2023Find a general investment of the space agency Artemis Moon program From 2012 to $ 93 billion since 2025, it was expended, 23.8 billion dollars were spent from 2022. expressed.

Another OG report “Influential quality management and inexperienced workforce, understanding of Boeing in August 2024, and continued to postpone schedule delays and schedule delays and postponement of the table,” the upper stage of the SLS missile exploration. At the top stage, it was planned to be delivered to NASA in early 2021, but its development is now projected to be fully fully before 2027.

Available management is also not visible as a fan of the Artemis program. “Artemis architecture is extremely inefficient, because this recently is a consultant near President Donald Trump” Spacex CEO and founder CEO and founder Elon Musk write X. “Completely need something new.”

During the opening speech, Trump did not remind the bear, on the contrary, “Launch American astronauts to plant stars on the planet of the planet and stripes”. Musk, as well as in the surface of the Red Planet by 2026, the Starsock Starship’i in the spacex’s Meardock Starship’s place in the 2030s, there are eyes before Starship to test astronauts for astronauts.

Depending on where you stand in the SLS, Boeing’s potential development or NASA’s mass rocket is a concern that the moon is only a voice.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *